| Schedule of Peer Reviews |
|
| Directions for Setting Termination Dates |
|
The dates listed are projected. Actual dates are announced at the beginning of each peer review session. For efficiency, we simply calculate the termination date as 6 months beyond the projected implementation date. If you have used a different date, there’s no need to change it if it’s beyond the projected implementation date. This method eases our coordination in the event peer review sessions are added or postponed. |
|
|
Animal Production & Protection |
Nutrition, Food Safety/Quality
|
Natural Resources and Sustainable Agricultural Systems |
Crop Production & Protection
|
|
|
|
|
|
|
| Review Title NP 101 Food Animal Production December 2013 Ad Hoc Review |
| Termination Date February 28, 2018 |
Program Analyst: Chris |
| Number of Projects in the Review 3 |
Planned Duration 27 months |
| Status of Reviews PDRAMs are due to OSQR June 3, 2013. |
| Concurrence Memo Due to Area Director |
May 27, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
June 3, 2013 |
| Conflicts of Interest List Due to OSQR |
June 17, 2013 |
| Project Plans due to OSQR |
December 2, 2013 |
| Review Period |
December 3, 2013- March 10, 2014 |
| Project's Targeted Implementation Date |
May 12, 2014 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 101 Food Animal Production June 2014 Ad Hoc Review |
| Termination Date May 31, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 1 |
Planned Duration 34 months |
| Status of Reviews Preliminary planning. |
| Concurrence Memo Due to Area Director |
November 28, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
December 5, 2013 |
| Conflicts of Interest List Due to OSQR |
December 19, 2013 |
| Project Plans due to OSQR |
June 5, 2014 |
| Review Period |
June 6-September 11, 2014 |
| Project's Targeted Implementation Date |
November 13, 2014 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 101 Food Animal Production Panel Review |
| Termination Date February 28, 2018 |
Program Analyst: Chris |
| Number of Projects in the Review 30 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Food Animal Production Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
August 26, 2016 |
| PDRAMs Due to Area & OSQR with Schedule |
September 2, 2016 |
| Conflicts of Interest List Due to OSQR |
September 16, 2016 |
| Project Plans due to OSQR |
March 3, 2017 |
| Review Period |
March 6-June 9, 2017 |
| Project's Targeted Implementation Date |
August 11, 2017 |
Ad Hoc Cut-Off Date August 26, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 103 Animal Health Panel Review |
| Termination Date April 30, 2017 |
Program Analyst: Linda |
| Number of Projects in the Review 41 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Animal Health Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
November 11, 2015 |
| PDRAMs Due to Area & OSQR with Schedule |
November 18, 2015 |
| Conflicts of Interest List Due to OSQR |
December 2, 2015 |
| Project Plans due to OSQR |
May 18, 2016 |
| Review Period |
May 19-August 24, 2016 |
| Project's Targeted Implementation Date |
October 26, 2016 |
Ad Hoc Cut-Off Date November 11, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 104 Veterinary, Medical and Urban Entomology Panel Review |
| Termination Date March 30, 2015 |
Program Analyst: Linda |
| Number of Projects in the Review 11 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program. |
| Concurrence Memo Due to Area Director |
October 4, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
October 11, 2013 |
| Conflicts of Interest List Due to OSQR |
October 25, 2013 |
| Project Plans due to OSQR |
April 11, 2014 |
| Review Period |
April 14-July 18, 2014 |
| Project's Targeted Implementation Date |
September 12, 2014 |
Ad Hoc Cut-Off Date September 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 106 Aquaculture Panel Review |
| Termination Date June 30, 2015 |
Program Analyst: Linda |
| Number of Projects in the Review 22 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program. |
| Concurrence Memo Due to Area Director |
January 3, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
January 10, 2014 |
| Conflicts of Interest List Due to OSQR |
January 24, 2014 |
| Project Plans due to OSQR |
July 11, 2014 |
| Review Period |
July 14 - October 17, 2014 |
| Project's Targeted Implementation Date |
December 12, 2014 |
Ad Hoc Cut-Off Date December 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 107 Human Nutrition Panel Review Schedule A |
| Termination Date December 31, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Project plans are due to OSQR September 30, 2013. |
| Concurrence Memo Due to Area Director |
February 21, 2013-complete |
| PDRAMs Due to Area & OSQR with Schedule |
February 28, 2013-complete |
| Conflicts of Interest List Due to OSQR |
March 14, 2013-complete |
| Project Plans due to OSQR |
September 30, 2013 |
| Review Period |
September 31, 2013-January 20, 2014 |
| Project's Targeted Implementation Date |
June 6, 2014 |
Ad Hoc Cut-Off Date February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 107 Human Nutrition Panel Review Schedule B |
| Termination Date December 31, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Project plans are due to OSQR October 28, 2013. |
| Concurrence Memo Due to Area Director |
February 21, 2013-complete |
| PDRAMs Due to Area & OSQR with Schedule |
April 1, 2013-complete |
| Conflicts of Interest List Due to OSQR |
April 15, 2013-complete |
| Project Plans due to OSQR |
October 28, 2013 |
| Review Period |
October 29, 2013 February 21, 2014 |
| Project's Targeted Implementation Date |
June 6, 2014 |
Ad Hoc Cut-Off Date February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 108 Food Safety (Animal and Plant Products) Panel Review |
| Termination Date August 31, 2016 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program. |
| Concurrence Memo Due to Area Director |
February 25, 2015 |
| PDRAMs Due to Area & OSQR with Schedule |
March 4, 2015 |
| Conflicts of Interest List Due to OSQR |
March 18, 2015 |
| Project Plans due to OSQR |
September 2, 2015 |
| Review Period |
September 3-December 9, 2015 |
| Project's Targeted Implementation Date |
February 10, 2016 |
Ad Hoc Cut-Off Date February 25, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 211 Water Availability and Watershed Management June 2013 Ad Hoc Review |
| Termination Date June 30, 2017 |
Program Analyst: Chris |
| Number of Projects in the Review 1 |
Planned Duration 35 months |
| Status of Reviews Project plan is due to OSQR June 4, 2013. |
| Concurrence Memo Due to Area Director |
November 27, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
December 4, 2012-complete |
| Conflicts of Interest List Due to OSQR |
December 18, 2012-complete |
| Project Plans due to OSQR |
June 4, 2013 |
| Review Period |
June 5-September 20, 2013 |
| Project's Targeted Implementation Date |
November 12, 2013 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 211 Water Availability and Watershed Management Panel Review |
| Termination Date June 30, 2017 |
Program Analyst: Chris |
| Number of Projects in the Review 37 |
Planned Duration 60 months |
| Status of Reviews Preliminary planning. Existing ARS projects entering or modified under the Water Availability and Watershed Management Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 22, 2016 |
| PDRAMs Due to Area & OSQR with Schedule |
January 29, 2016 |
| Conflicts of Interest List Due to OSQR |
February 12, 2016 |
| Project Plans due to OSQR |
July 29, 2016 |
| Review Period |
August 1 - November 4, 2016 |
| Project's Targeted Implementation Date |
December 30, 2016 |
Ad Hoc Cut-Off Date January 22, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 212 Climate Change, Soils and Emissions Panel Review |
| Termination Date October 31, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 38 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
April 29, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
May 6, 2014 |
| Conflicts of Interest List Due to OSQR |
May 20, 2014 |
| Project Plans due to OSQR |
November 4, 2014 |
| Review Period |
November 5, 2014-February 10, 2015 |
| Project's Targeted Implementation Date |
April 28, 2015 |
Ad Hoc Cut-Off Date April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 213 Bioenergy Panel Review |
| Termination Date April 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 14 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program. |
| Concurrence Memo Due to Area Director |
November 8, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
November 15, 2013 |
| Conflicts of Interest List Due to OSQR |
December 2, 2013 |
| Project Plans due to OSQR |
May 16, 2014 |
| Review Period |
May 19-August 22, 2014 |
| Project's Targeted Implementation Date |
October 17, 2014 |
Ad Hoc Cut-Off Date October 18, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 214 Agricultural and Industrial Byproducts Panel Review |
| Termination Date October 31, 2015 |
Program Analyst: Linda |
| Number of Projects in the Review 16 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
April 25, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
May 2, 2014 |
| Conflicts of Interest List Due to OSQR |
May 16, 2014 |
| Project Plans due to OSQR |
October 31, 2014 |
| Review Period |
November 3, 2014-February 6, 2015 |
| Project's Targeted Implementation Date |
April 24, 2015 |
Ad Hoc Cut-Off Date April 4, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 215 Pasture, Forage and Rangeland Systems December 2013 Ad Hoc Review |
| Termination Date June 30, 2018 |
Program Analyst: Linda |
| Number of Projects in the Review 1 |
Planned Duration 39 months |
| Status of Reviews PDRAM is due to OSQR June 3, 2013. |
| Concurrence Memo Due to Area Director |
May 27, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
June 3, 2013 |
| Conflicts of Interest List Due to OSQR |
June 17, 2013 |
| Project Plans due to OSQR |
December 2, 2013 |
| Review Period |
December 3, 2013-March 10, 2014 |
| Project's Targeted Implementation Date |
May 12, 2014 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 215 Pasture, Forage and Rangeland Systems Panel Review |
| Termination Date July 30, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 32 |
Planned Duration 60 months |
| Status of Reviews Revisions and certifications are in progress. |
| Concurrence Memo Due to Area Director |
January 24, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
February 21, 2012-complete |
| Conflicts of Interest List Due to OSQR |
March 6, 2012-complete |
| Project Plans due to OSQR |
August 20, 2012-complete |
| Review Period |
August 21 - November 26, 2012 |
| Project's Targeted Implementation Date |
January 21, 2013 |
Ad Hoc Cut-Off Date January 24, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 215 Pasture, Forage and Rangeland Systems Panel Review - Future |
| Termination Date June 30, 2018 |
Program Analyst: Linda |
| Number of Projects in the Review 25 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Pasture, Forage and Rangeland Systems Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
December 16, 2016 |
| PDRAMs Due to Area & OSQR with Schedule |
December 23, 2016 |
| Conflicts of Interest List Due to OSQR |
January 6, 2017 |
| Project Plans due to OSQR |
June 23, 2017 |
| Review Period |
June 26-September 29, 2017 |
| Project's Targeted Implementation Date |
December 1, 2017 |
Ad Hoc Cut-Off Date December 16, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 216 Agricultural System Competitiveness and Sustainability Panel Review |
| Termination Date February 28, 2014 |
Program Analyst: Linda |
| Number of Projects in the Review 16 |
Planned Duration 60 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
August 10, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
September 7, 2012-complete |
| Conflicts of Interest List Due to OSQR |
September 21, 2012-complete |
| Project Plans due to OSQR |
March 8, 2013-complete |
| Review Period |
March 11 - June 14, 2013 |
| Project's Targeted Implementation Date |
August 9, 2013 |
Ad Hoc Cut-Off Date August 10, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resouces, Genomics & Genetic Improvement December 2013 Ad Hoc Review |
| Termination Date September 30, 2018 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 1 |
Planned Duration 46 Months |
| Status of Reviews The PDRAM is due to OSQR June 3, 2013. |
| Concurrence Memo Due to Area Director |
May 27, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
June 3, 2013 |
| Conflicts of Interest List Due to OSQR |
June 17, 2013 |
| Project Plans due to OSQR |
December 2, 2013 |
| Review Period |
December 3, 2013-March 10, 2014 |
| Project's Targeted Implementation Date |
May 12, 2014 |
Ad Hoc Cut-Off Date
| |
| Review Title NP 301 Plant Genetic Resouces, Genomics & Genetic Improvement June 2014 Ad Hoc Review |
| Termination Date May 31, 2015 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 1 |
Planned Duration 43 months |
| Status of Reviews PDRAM is due to OSQR December 5, 2013. |
| Concurrence Memo Due to Area Director |
November 28, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
December 5, 2013 |
| Conflicts of Interest List Due to OSQR |
December 19, 2013 |
| Project Plans due to OSQR |
June 5, 2014 |
| Review Period |
June 6-September 11, 2014 |
| Project's Targeted Implementation Date |
November 13, 2014 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A |
| Termination Date December 31, 2013 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 175 |
Planned Duration 60 months |
| Status of Reviews Revisions and certifications are in progress. |
| Concurrence Memo Due to Area Director |
April 2, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
April 30, 2012-complete |
| Conflicts of Interest List Due to OSQR |
May 14, 2012-complete |
| Project Plans due to OSQR |
October 29, 2012-complete |
| Review Period |
October 30, 2012-February 4, 2013-complete |
| Project's Targeted Implementation Date |
June 27, 2013 |
Ad Hoc Cut-Off Date April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A - Future |
| Termination Date September 30, 2018 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 155 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 24, 2017 |
| PDRAMs Due to Area & OSQR with Schedule |
January 31, 2017 |
| Conflicts of Interest List Due to OSQR |
February 14, 2017 |
| Project Plans due to OSQR |
August 1, 2017 |
| Review Period |
August 2-November 7, 2017 |
| Project's Targeted Implementation Date |
March 12, 2018 |
Ad Hoc Cut-Off Date January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B |
| Termination Date December 31, 2013 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 175 |
Planned Duration 60 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
April 2, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
May 28, 2012-complete |
| Conflicts of Interest List Due to OSQR |
June 11, 2012-complete |
| Project Plans due to OSQR |
November 26, 2012-complete |
| Review Period |
November 27, 2012-March 4, 2013 |
| Project's Targeted Implementation Date |
June 27, 2013 |
Ad Hoc Cut-Off Date April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B - Future |
| Termination Date September 30, 2018 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 155 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 24, 2017 |
| PDRAMs Due to Area & OSQR with Schedule |
March 3, 2017 |
| Conflicts of Interest List Due to OSQR |
March 17, 2017 |
| Project Plans due to OSQR |
September 1, 2017 |
| Review Period |
September 4-December 8, 2017 |
| Project's Targeted Implementation Date |
March 12, 2018 |
Ad Hoc Cut-Off Date January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule C |
| Termination Date December 31, 2013 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 175 |
Planned Duration 60 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
April 2, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
July 5, 2012-complete |
| Conflicts of Interest List Due to OSQR |
July 19, 2012-complete |
| Project Plans due to OSQR |
January 3, 2013-complete |
| Review Period |
January 4-April 11, 2013 |
| Project's Targeted Implementation Date |
June 27, 2013 |
Ad Hoc Cut-Off Date April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule C - Future |
| Termination Date September 30, 2018 |
Program Analyst: Chris & Linda |
| Number of Projects in the Review 155 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 24, 2017 |
| PDRAMs Due to Area & OSQR with Schedule |
April 3, 2017 |
| Conflicts of Interest List Due to OSQR |
April 17, 2017 |
| Project Plans due to OSQR |
October 2, 2017 |
| Review Period |
October 3, 2017-January 8, 2018 |
| Project's Targeted Implementation Date |
March 12, 2018 |
Ad Hoc Cut-Off Date January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 303 Plant Diseases June 2013 Ad Hoc Review |
| Termination Date August 31, 2017 |
Program Analyst: Linda |
| Number of Projects in the Review 3 |
Planned Duration 51 months |
| Status of Reviews Project plans are due to OSQR on June 4, 2013. |
| Concurrence Memo Due to Area Director |
November 27, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
December 4, 2012-complete |
| Conflicts of Interest List Due to OSQR |
December 18, 2012-complete |
| Project Plans due to OSQR |
June 4, 2013 |
| Review Period |
June 5-September 10, 2013 |
| Project's Targeted Implementation Date |
November 12, 2013 |
Ad Hoc Cut-Off Date N/A. | |
| Review Title NP 303 Plant Diseases Panel Review |
| Termination Date August 31, 2017 |
Program Analyst: Linda |
| Number of Projects in the Review 57 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Diseases Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
March 14, 2016 |
| PDRAMs Due to Area & OSQR with Schedule |
March 21, 2016 |
| Conflicts of Interest List Due to OSQR |
April 4, 2016 |
| Project Plans due to OSQR |
September 19, 2016 |
| Review Period |
September 20-December 26, 2016 |
| Project's Targeted Implementation Date |
February 27, 2017 |
Ad Hoc Cut-Off Date March 14, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule A |
| Termination Date March 31, 2016 |
Program Analyst: Linda |
| Number of Projects in the Review 73 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
July 11, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
July 18, 2014 |
| Conflicts of Interest List Due to OSQR |
August 5, 2014 |
| Project Plans due to OSQR |
January 20, 2015 |
| Review Period |
January 21-April 28, 2015 |
| Project's Targeted Implementation Date |
September 9, 2015 |
Ad Hoc Cut-Off Date June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule B |
| Termination Date March 31, 2016 |
Program Analyst: Linda |
| Number of Projects in the Review 73 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
July 11, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
September 17, 2014 |
| Conflicts of Interest List Due to OSQR |
October 1, 2014 |
| Project Plans due to OSQR |
March 18, 2015 |
| Review Period |
March 19-June 24, 2015 |
| Project's Targeted Implementation Date |
September 9, 2015 |
Ad Hoc Cut-Off Date June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 305 Crop Production Panel Review |
| Termination Date May 31, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 27 |
Planned Duration 60 months |
| Status of Reviews Project Plans are due to OSQR July 29, 2013. |
| Concurrence Memo Due to Area Director |
November 30, 2012-complete |
| PDRAMs Due to Area & OSQR with Schedule |
December 28, 2012-complete |
| Conflicts of Interest List Due to OSQR |
January 11, 2013-complete |
| Project Plans due to OSQR |
July 29, 2013 |
| Review Period |
October 1-October 31, 2013 |
| Project's Targeted Implementation Date |
December 29, 2013 |
Ad Hoc Cut-Off Date November 30, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule A |
| Termination Date November 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 70 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
April 29, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
May 6, 2014 |
| Conflicts of Interest List Due to OSQR |
May 20, 2014 |
| Project Plans due to OSQR |
November 3, 2014 |
| Review Period |
November 4-February 10, 2015 |
| Project's Targeted Implementation Date |
May 26, 2015 |
Ad Hoc Cut-Off Date April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule B |
| Termination Date November 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 70 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this National Program. |
| Concurrence Memo Due to Area Director |
April 29, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
June 3, 2014 |
| Conflicts of Interest List Due to OSQR |
June 17, 2014 |
| Project Plans due to OSQR |
December 2, 2014 |
| Review Period |
December 3, 2014-March 10, 2015 |
| Project's Targeted Implementation Date |
May 26, 2015 |
Ad Hoc Cut-Off Date April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
|
|
|
|