Peer Review Schedules
|
Directions for Setting Termination Dates
|
|
The dates listed are projected. Actual dates are announced at the beginning
of each peer review session. For efficiency, we simply calculate
the termination date as 6 months beyond the projected implementation
date. If you have used a different date, theres no need to
change it if its beyond the projected implementation date.
This method eases our coordination in the event peer review sessions
are added or postponed.
|
|
|
Animal Production & Protection
|
Nutrition, Food Safety/Quality
|
Natural Resources and Sustainable Agricultural Systems
|
Crop Production & Protection
|
|
|
|
|
|
|
|
Review Title
NP 101 Food Animal Production December 2013 Ad Hoc Review
|
|
Termination Date
February 28, 2018
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
3
|
Planned Duration
27 months
|
|
Status of Reviews
PDRAMs are due to OSQR June 3, 2013.
|
|
Concurrence Memo Due to Area Director
|
May 27, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 3, 2013
|
|
Conflicts of Interest List Due to OSQR
|
June 17, 2013
|
|
Project Plans due to OSQR
|
December 2, 2013
|
|
Review Period
|
December 3, 2013- March 10, 2014
|
|
Project's Targeted Implementation Date
|
May 12, 2014
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 101 Food Animal Production June 2014 Ad Hoc Review
|
|
Termination Date
May 31, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
1
|
Planned Duration
34 months
|
|
Status of Reviews
Preliminary planning.
|
|
Concurrence Memo Due to Area Director
|
November 28, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 5, 2013
|
|
Conflicts of Interest List Due to OSQR
|
December 19, 2013
|
|
Project Plans due to OSQR
|
June 5, 2014
|
|
Review Period
|
June 6-September 11, 2014
|
|
Project's Targeted Implementation Date
|
November 13, 2014
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 101 Food Animal Production Panel Review
|
|
Termination Date
February 28, 2018
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
30
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Food Animal Production Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
August 26, 2016
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 2, 2016
|
|
Conflicts of Interest List Due to OSQR
|
September 16, 2016
|
|
Project Plans due to OSQR
|
March 3, 2017
|
|
Review Period
|
March 6-June 9, 2017
|
|
Project's Targeted Implementation Date
|
August 11, 2017
|
Ad Hoc Cut-Off Date
August 26, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 103 Animal Health Panel Review
|
|
Termination Date
April 30, 2017
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
41
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Animal Health Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
November 11, 2015
|
|
PDRAMs Due to Area & OSQR with Schedule
|
November 18, 2015
|
|
Conflicts of Interest List Due to OSQR
|
December 2, 2015
|
|
Project Plans due to OSQR
|
May 18, 2016
|
|
Review Period
|
May 19-August 24, 2016
|
|
Project's Targeted Implementation Date
|
October 26, 2016
|
Ad Hoc Cut-Off Date
November 11, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 104 Veterinary, Medical and Urban Entomology Panel Review
|
|
Termination Date
March 30, 2015
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
11
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program.
|
|
Concurrence Memo Due to Area Director
|
October 4, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 11, 2013
|
|
Conflicts of Interest List Due to OSQR
|
October 25, 2013
|
|
Project Plans due to OSQR
|
April 11, 2014
|
|
Review Period
|
April 14-July 18, 2014
|
|
Project's Targeted Implementation Date
|
September 12, 2014
|
Ad Hoc Cut-Off Date
September 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 106 Aquaculture Panel Review
|
|
Termination Date
June 30, 2015
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
22
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program.
|
|
Concurrence Memo Due to Area Director
|
January 3, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
January 10, 2014
|
|
Conflicts of Interest List Due to OSQR
|
January 24, 2014
|
|
Project Plans due to OSQR
|
July 11, 2014
|
|
Review Period
|
July 14 - October 17, 2014
|
|
Project's Targeted Implementation Date
|
December 12, 2014
|
Ad Hoc Cut-Off Date
December 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 107 Human Nutrition Panel Review Schedule A
|
|
Termination Date
December 31, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Project plans are due to OSQR September 30, 2013.
|
|
Concurrence Memo Due to Area Director
|
February 21, 2013-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
February 28, 2013-complete
|
|
Conflicts of Interest List Due to OSQR
|
March 14, 2013-complete
|
|
Project Plans due to OSQR
|
September 30, 2013
|
|
Review Period
|
September 31, 2013-January 20, 2014
|
|
Project's Targeted Implementation Date
|
June 6, 2014
|
Ad Hoc Cut-Off Date
February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 107 Human Nutrition Panel Review Schedule B
|
|
Termination Date
December 31, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Project plans are due to OSQR October 28, 2013.
|
|
Concurrence Memo Due to Area Director
|
February 21, 2013-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 1, 2013-complete
|
|
Conflicts of Interest List Due to OSQR
|
April 15, 2013-complete
|
|
Project Plans due to OSQR
|
October 28, 2013
|
|
Review Period
|
October 29, 2013 February 21, 2014
|
|
Project's Targeted Implementation Date
|
June 6, 2014
|
Ad Hoc Cut-Off Date
February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 108 Food Safety (Animal and Plant Products) Panel Review
|
|
Termination Date
August 31, 2016
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program.
|
|
Concurrence Memo Due to Area Director
|
February 25, 2015
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 4, 2015
|
|
Conflicts of Interest List Due to OSQR
|
March 18, 2015
|
|
Project Plans due to OSQR
|
September 2, 2015
|
|
Review Period
|
September 3-December 9, 2015
|
|
Project's Targeted Implementation Date
|
February 10, 2016
|
Ad Hoc Cut-Off Date
February 25, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 211 Water Availability and Watershed Management June 2013 Ad Hoc Review
|
|
Termination Date
June 30, 2017
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
1
|
Planned Duration
35 months
|
|
Status of Reviews
Project plan is due to OSQR June 4, 2013.
|
|
Concurrence Memo Due to Area Director
|
November 27, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 4, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
December 18, 2012-complete
|
|
Project Plans due to OSQR
|
June 4, 2013
|
|
Review Period
|
June 5-September 20, 2013
|
|
Project's Targeted Implementation Date
|
November 12, 2013
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 211 Water Availability and Watershed Management Panel Review
|
|
Termination Date
June 30, 2017
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
37
|
Planned Duration
60 months
|
|
Status of Reviews
Preliminary planning. Existing ARS projects entering or modified under the Water Availability and Watershed Management Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 22, 2016
|
|
PDRAMs Due to Area & OSQR with Schedule
|
January 29, 2016
|
|
Conflicts of Interest List Due to OSQR
|
February 12, 2016
|
|
Project Plans due to OSQR
|
July 29, 2016
|
|
Review Period
|
August 1 - November 4, 2016
|
|
Project's Targeted Implementation Date
|
December 30, 2016
|
Ad Hoc Cut-Off Date
January 22, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 212 Climate Change, Soils and Emissions Panel Review
|
|
Termination Date
October 31, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
38
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
April 29, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 6, 2014
|
|
Conflicts of Interest List Due to OSQR
|
May 20, 2014
|
|
Project Plans due to OSQR
|
November 4, 2014
|
|
Review Period
|
November 5, 2014-February 10, 2015
|
|
Project's Targeted Implementation Date
|
April 28, 2015
|
Ad Hoc Cut-Off Date
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 213 Bioenergy Panel Review
|
|
Termination Date
April 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
14
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program.
|
|
Concurrence Memo Due to Area Director
|
November 8, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
November 15, 2013
|
|
Conflicts of Interest List Due to OSQR
|
December 2, 2013
|
|
Project Plans due to OSQR
|
May 16, 2014
|
|
Review Period
|
May 19-August 22, 2014
|
|
Project's Targeted Implementation Date
|
October 17, 2014
|
Ad Hoc Cut-Off Date
October 18, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 214 Agricultural and Industrial Byproducts Panel Review
|
|
Termination Date
October 31, 2015
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
16
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
April 25, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 2, 2014
|
|
Conflicts of Interest List Due to OSQR
|
May 16, 2014
|
|
Project Plans due to OSQR
|
October 31, 2014
|
|
Review Period
|
November 3, 2014-February 6, 2015
|
|
Project's Targeted Implementation Date
|
April 24, 2015
|
Ad Hoc Cut-Off Date
April 4, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 215 Pasture, Forage and Rangeland Systems December 2013 Ad Hoc Review
|
|
Termination Date
June 30, 2018
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
1
|
Planned Duration
39 months
|
|
Status of Reviews
PDRAM is due to OSQR June 3, 2013.
|
|
Concurrence Memo Due to Area Director
|
May 27, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 3, 2013
|
|
Conflicts of Interest List Due to OSQR
|
June 17, 2013
|
|
Project Plans due to OSQR
|
December 2, 2013
|
|
Review Period
|
December 3, 2013-March 10, 2014
|
|
Project's Targeted Implementation Date
|
May 12, 2014
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 215 Pasture, Forage and Rangeland Systems Panel Review
|
|
Termination Date
July 30, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
32
|
Planned Duration
60 months
|
|
Status of Reviews
Revisions and certifications are in progress.
|
|
Concurrence Memo Due to Area Director
|
January 24, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
February 21, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
March 6, 2012-complete
|
|
Project Plans due to OSQR
|
August 20, 2012-complete
|
|
Review Period
|
August 21 - November 26, 2012
|
|
Project's Targeted Implementation Date
|
January 21, 2013
|
Ad Hoc Cut-Off Date
January 24, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 215 Pasture, Forage and Rangeland Systems Panel Review - Future
|
|
Termination Date
June 30, 2018
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
25
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Pasture, Forage and Rangeland Systems Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
December 16, 2016
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 23, 2016
|
|
Conflicts of Interest List Due to OSQR
|
January 6, 2017
|
|
Project Plans due to OSQR
|
June 23, 2017
|
|
Review Period
|
June 26-September 29, 2017
|
|
Project's Targeted Implementation Date
|
December 1, 2017
|
Ad Hoc Cut-Off Date
December 16, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 216 Agricultural System Competitiveness and Sustainability Panel Review
|
|
Termination Date
February 28, 2014
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
16
|
Planned Duration
60 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
August 10, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 7, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
September 21, 2012-complete
|
|
Project Plans due to OSQR
|
March 8, 2013-complete
|
|
Review Period
|
March 11 - June 14, 2013
|
|
Project's Targeted Implementation Date
|
August 9, 2013
|
Ad Hoc Cut-Off Date
August 10, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resouces, Genomics & Genetic Improvement December 2013 Ad Hoc Review
|
|
Termination Date
September 30, 2018
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
1
|
Planned Duration
46 Months
|
|
Status of Reviews
The PDRAM is due to OSQR June 3, 2013.
|
|
Concurrence Memo Due to Area Director
|
May 27, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 3, 2013
|
|
Conflicts of Interest List Due to OSQR
|
June 17, 2013
|
|
Project Plans due to OSQR
|
December 2, 2013
|
|
Review Period
|
December 3, 2013-March 10, 2014
|
|
Project's Targeted Implementation Date
|
May 12, 2014
|
Ad Hoc Cut-Off Date
|
|
|
Review Title
NP 301 Plant Genetic Resouces, Genomics & Genetic Improvement June 2014 Ad Hoc Review
|
|
Termination Date
May 31, 2015
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
1
|
Planned Duration
43 months
|
|
Status of Reviews
PDRAM is due to OSQR December 5, 2013.
|
|
Concurrence Memo Due to Area Director
|
November 28, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 5, 2013
|
|
Conflicts of Interest List Due to OSQR
|
December 19, 2013
|
|
Project Plans due to OSQR
|
June 5, 2014
|
|
Review Period
|
June 6-September 11, 2014
|
|
Project's Targeted Implementation Date
|
November 13, 2014
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A
|
|
Termination Date
December 31, 2013
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
175
|
Planned Duration
60 months
|
|
Status of Reviews
Revisions and certifications are in progress.
|
|
Concurrence Memo Due to Area Director
|
April 2, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 30, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
May 14, 2012-complete
|
|
Project Plans due to OSQR
|
October 29, 2012-complete
|
|
Review Period
|
October 30, 2012-February 4, 2013-complete
|
|
Project's Targeted Implementation Date
|
June 27, 2013
|
Ad Hoc Cut-Off Date
April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A - Future
|
|
Termination Date
September 30, 2018
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
155
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 24, 2017
|
|
PDRAMs Due to Area & OSQR with Schedule
|
January 31, 2017
|
|
Conflicts of Interest List Due to OSQR
|
February 14, 2017
|
|
Project Plans due to OSQR
|
August 1, 2017
|
|
Review Period
|
August 2-November 7, 2017
|
|
Project's Targeted Implementation Date
|
March 12, 2018
|
Ad Hoc Cut-Off Date
January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B
|
|
Termination Date
December 31, 2013
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
175
|
Planned Duration
60 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
April 2, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 28, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
June 11, 2012-complete
|
|
Project Plans due to OSQR
|
November 26, 2012-complete
|
|
Review Period
|
November 27, 2012-March 4, 2013
|
|
Project's Targeted Implementation Date
|
June 27, 2013
|
Ad Hoc Cut-Off Date
April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B - Future
|
|
Termination Date
September 30, 2018
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
155
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 24, 2017
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 3, 2017
|
|
Conflicts of Interest List Due to OSQR
|
March 17, 2017
|
|
Project Plans due to OSQR
|
September 1, 2017
|
|
Review Period
|
September 4-December 8, 2017
|
|
Project's Targeted Implementation Date
|
March 12, 2018
|
Ad Hoc Cut-Off Date
January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule C
|
|
Termination Date
December 31, 2013
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
175
|
Planned Duration
60 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
April 2, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
July 5, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
July 19, 2012-complete
|
|
Project Plans due to OSQR
|
January 3, 2013-complete
|
|
Review Period
|
January 4-April 11, 2013
|
|
Project's Targeted Implementation Date
|
June 27, 2013
|
Ad Hoc Cut-Off Date
April 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule C - Future
|
|
Termination Date
September 30, 2018
|
Program Analyst:
Chris & Linda
|
|
Number of Projects in the Review
155
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 24, 2017
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 3, 2017
|
|
Conflicts of Interest List Due to OSQR
|
April 17, 2017
|
|
Project Plans due to OSQR
|
October 2, 2017
|
|
Review Period
|
October 3, 2017-January 8, 2018
|
|
Project's Targeted Implementation Date
|
March 12, 2018
|
Ad Hoc Cut-Off Date
January 24, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 303 Plant Diseases June 2013 Ad Hoc Review
|
|
Termination Date
August 31, 2017
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
3
|
Planned Duration
51 months
|
|
Status of Reviews
Project plans are due to OSQR on June 4, 2013.
|
|
Concurrence Memo Due to Area Director
|
November 27, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 4, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
December 18, 2012-complete
|
|
Project Plans due to OSQR
|
June 4, 2013
|
|
Review Period
|
June 5-September 10, 2013
|
|
Project's Targeted Implementation Date
|
November 12, 2013
|
Ad Hoc Cut-Off Date
N/A.
|
|
|
Review Title
NP 303 Plant Diseases Panel Review
|
|
Termination Date
August 31, 2017
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
57
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Diseases Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
March 14, 2016
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 21, 2016
|
|
Conflicts of Interest List Due to OSQR
|
April 4, 2016
|
|
Project Plans due to OSQR
|
September 19, 2016
|
|
Review Period
|
September 20-December 26, 2016
|
|
Project's Targeted Implementation Date
|
February 27, 2017
|
Ad Hoc Cut-Off Date
March 14, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 304 Crop Protection and Quarantine Panel Review - Schedule A
|
|
Termination Date
March 31, 2016
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
73
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
July 11, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
July 18, 2014
|
|
Conflicts of Interest List Due to OSQR
|
August 5, 2014
|
|
Project Plans due to OSQR
|
January 20, 2015
|
|
Review Period
|
January 21-April 28, 2015
|
|
Project's Targeted Implementation Date
|
September 9, 2015
|
Ad Hoc Cut-Off Date
June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 304 Crop Protection and Quarantine Panel Review - Schedule B
|
|
Termination Date
March 31, 2016
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
73
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
July 11, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 17, 2014
|
|
Conflicts of Interest List Due to OSQR
|
October 1, 2014
|
|
Project Plans due to OSQR
|
March 18, 2015
|
|
Review Period
|
March 19-June 24, 2015
|
|
Project's Targeted Implementation Date
|
September 9, 2015
|
Ad Hoc Cut-Off Date
June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 305 Crop Production Panel Review
|
|
Termination Date
May 31, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
27
|
Planned Duration
60 months
|
|
Status of Reviews
Project Plans are due to OSQR July 29, 2013.
|
|
Concurrence Memo Due to Area Director
|
November 30, 2012-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 28, 2012-complete
|
|
Conflicts of Interest List Due to OSQR
|
January 11, 2013-complete
|
|
Project Plans due to OSQR
|
July 29, 2013
|
|
Review Period
|
October 1-October 31, 2013
|
|
Project's Targeted Implementation Date
|
December 29, 2013
|
Ad Hoc Cut-Off Date
November 30, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule A
|
|
Termination Date
November 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
70
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
April 29, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 6, 2014
|
|
Conflicts of Interest List Due to OSQR
|
May 20, 2014
|
|
Project Plans due to OSQR
|
November 3, 2014
|
|
Review Period
|
November 4-February 10, 2015
|
|
Project's Targeted Implementation Date
|
May 26, 2015
|
Ad Hoc Cut-Off Date
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule B
|
|
Termination Date
November 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
70
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
|
|
Concurrence Memo Due to Area Director
|
April 29, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 3, 2014
|
|
Conflicts of Interest List Due to OSQR
|
June 17, 2014
|
|
Project Plans due to OSQR
|
December 2, 2014
|
|
Review Period
|
December 3, 2014-March 10, 2015
|
|
Project's Targeted Implementation Date
|
May 26, 2015
|
Ad Hoc Cut-Off Date
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
| |
|
Last Updated:
May 21, 2013
|
|
|
|
|